Freshman Design

Freshman Design

Search This Blog

Search by Date

Photo Gallery

First test with the added copper sulfate to water in cell- 5/13/15

The copper sulfate package-5/13/15

The current coming from the cells- 5/13/15

Copper sulfate- 5/13/15

Close up of the copper sulfate ions-5/13/15

The copper building up on the aluminum-5/13/15

The flip side of the aluminum has no copper on it-5/13/15

Another trial with more surface area. The copper is being transferred to the aluminum-5/13/15 
  
Minor seam leak- 5/8/15

Rich holding our weights- 5/8/15

A very small leak in the back- 5/8/15

Sandy and Rich duct taping the boat-5/1/15

Making sure the entire outside is covered-5/1/15

The outside of the finished project-5/1/15

The inside of the finished project-5/1/15

Cardboard used to make boat- 4/23/15
First Prototype- 4/22/15

Most materials used - 4/20/15

Clips used - 4/20/15

Motors tested - 4/20/15

Each cell up close - 4/20/15

Sandy adjusting the length of the segment - 4/20/15

Sandy cutting copper pipe - 4/20/15

Jess assembling cell - 4/20/15

Rich cutting wire - 4/20/15

The copper and aluminum used in the cell linked with wire - 4/20/15

Sanded aluminum  - 4/13/15
Rich testing the voltage - 4/13/15
Copper Pipe - 4/13/15
First Sketches  - 4/1/15
Rich explaining the very first approach - 4/1/15









No comments:

Post a Comment